Speak with authority, quality is trustworthy.

The response time of the PLC concept, response time difference under different output

by:Coolmay     2020-08-29
What is the response time of the PLC controller? In the output using circulation refresh and direct way to refresh, what's the difference between the response time? From PLC controller receives an input signal to the PLC controller output to output a control signal, the time needed for the response time is PLC, using a loop to refresh, before the start of the refresh of a scan cycle instantly receive a signal, the signal in the current work, the response time the shortest, equal to the input delay time, a scan cycle time, output delay time together; If in a scan cycle of the I/O update stage just after receiving a signal, then the signal can't work this week period, must wait until the next scan cycle to work, the longest response time at this moment, it is equal to the input delay time, the two scan cycle time and output delay time together; When using direct output refresh, the longest response time is equal to the input delay time, a scan cycle time, output delay time together.
There are many issues that affect programmable control systems, which has led to the need of getting specialists trained in certain areas so as to handle all issues that may arise as well as plc manufacturers products that can solve plc controller price problems.
Shenzhen Coolmay Technology Co., Ltd. will provide branded products and services of superior quality and value that improve the lives of the world’s consumers.
Shenzhen Coolmay Technology Co., Ltd. deems that we can drive consumer transactions using high-tech tools like artificial intelligence and cognitive data sets.
Chat Online
Chat Online
Chat Online inputting...
Sign in with: