Speak with authority, quality is trustworthy.

The PLC program execution know experimental design

by:Coolmay     2020-08-21
A required equipment, tools, materials, project are shown in table 5 - 1. Second, the training content according to the previous example connection, input program, according to the requirements. 1, the project description ( 1) According to provide the principle of PLC controller wiring diagram wiring; ( 2) Will provide the reference to write PLC controller program; ( 3) According to the operation steps, observe state of input and output equipment. Through the computer monitor screen, observe and record the status of each element and draw the sequence diagram; ( 4) In combination with PLC program execution process, analysis program. Table 5-2, training requirements 1 2 project required equipment, tools and materials. In figure 5-1 wiring diagram and control procedures 6, complete the PLC control system hardware connection. Diagram because the signal of pulse signal generator and button input signal is different, therefore, could not use the same COM port. In figure 5 - 7 provide ladder diagram, using a computer or handheld programmer written to the PLC. 2. More than 2 observations required to exploit the program observe and know the scan cycle and execution process. ( 1) Adjust the frequency of the encoder to 1 KHZ. Press the switch SB1, at this time, the program timing starts the timer, and X0 rise along to reset the counter of the initial value, current value is 0. The number of pulses counter input again. After 1 s clock, time to time, stop counting. How much is the watch counter current value at this time. On the surface, the current value should be in 1000 or so, but in fact the current value is much less, why? ( 2) Adjust the frequency of the encoder to 20 hz. Repeat ( 1) Counter the current value of the operation, observation, and ( 1) What's the difference? Why is that? ( 3) Disconnect SB1, close the encoder power, press the switch SB2, why only two light bright one? Combined with the program execution process analysis. Part 3 sequence diagram analysis after press the switch, relay sequence diagram as shown in figure 5 - 8. According to the results of observation, complement other relay sequence diagram. Third, training report requirements and evaluation criteria 1 training requirements ( 1) Practical operation results, according to the standard writing practice report. According to given ladder diagram, write the instruction list; Answer the questions in observation requirements; Figure 5 - supplement Part of the timing; Summarizes the practical problems arising from the operation process; According to the wiring schematic drawing out the actual wiring diagram; Figure 5 - 5 three sections in the program, just change the position before and after the execution, but the result is different, combined with the corresponding sequence diagram to analyze its reasons.
Getting doesn't have to be expensive, time-consuming, or difficult. It all comes down to the right method and a plc controller price plc manufacturers in place.
To know more about plc manufacturers, please check our website at Coolmay PLC.
Looking for Manufacturers in China? Then Shenzhen Coolmay Technology Co., Ltd. is the right choice. we are a well known programmable control systems plc manufacturers Manufacturers and suppliers from China.
Shenzhen Coolmay Technology Co., Ltd. can assure you that we never compromise on our quality standards and are one of the best in the market at present.
Chat Online
Chat Online
Chat Online inputting...
Sign in with: