Speak with authority, quality is trustworthy.

Coolmay  >  AI - Page Sitemap  >  Best relay in plc programming Suppliers for environmental protection engineering
Best relay in plc programming Suppliers for environmental protection engineering

Best relay in plc programming Suppliers for environmental protection engineering
  • Best relay in plc programming Suppliers for environmental protection engineering
  • Best relay in plc programming Suppliers for environmental protection engineering

Best relay in plc programming Suppliers for environmental protection engineering

Coolmay PLC applies military-grade chip,faster operating speed and strong anti jamming capability.The inputs and outputs apply opto-isolator.Analog i/o,RS232 and RS485 areintegrated.It is a new control concept in functions,cost-saving and conveniences.
Inquire Online
Get the latest price
Quantity Needed:
Pieces
E-mail:

Product Description:

 The device includes functions below 

16DI/16DO, transistor output,

one channel analog input 4-20mA

RS232, RS485 port

ModelCX3G-16MCX3G-24MCX3G-32MCX3G-48MCX3G-34MCX3G-64MCX3G-80M
Dimension85*90*36mm130*90*36mm200*90*36mm285*90*36mm
Cutout size77*99mm122*99mm192*99mm277*99mm
InstallationFixed hole installation and DIN-Rail (35mm )
FeaturesSupport interrupt, linear arc interpolation, PID auto-tuning. 32K program capacity, 32K retentive register
I/O levelInput: Passive NPN, public terminal isolated
Transistor output: NPN
Relay output: Normally open dry contact
Digital I/O8DI/8DO12DI/12DO16DI/16DO24DI/24DO18DI/16DO32DI/32DO40DI/40DO
DO typeTransistor(MT) or mixed(2T6R)Relay(MR) or transistor(MT) or mixed(MRT)
(Relay output: max load 5A/ transistor output: max load 500mA)
High speed countingSingle phase 6 channel 60KHz, or 2 AB 60KHz + 1 AB 10KHz, or 2 ABZ 60KHz + 1 AB phase 10 KHz
High speed pulse8 channels, Y0-Y3 is 100KHz, Y4-Y7 is 10KHz
High-speed counting + high-speed pulse < 480KHz
Analog I/ONull6AI/4AO2AI8AI/4AO12AI/8AO16AI/8AO4AI/4AO
(optional)
AI typeType E/K/S/T/J thermocouple/ PT100/ PT1000/ NTC10K/ NTC50K/ NTC100K/
(optional)0~10V/ 0~5V/ 0-20mA/ 4-20mA

 -5V~5V/ -10V~10V(except for CX3G-16M)
AO type0~10V/ 0-~5V/ 0~20mA/ 4~20mA
(optional)-5~5V/ -10~10V (2DA for 1 minus temperature)
Default COM port1 Mini type B USB port, 1 Rs232(Interface terminal is mouse female port with 8 holes), 2 RS485 ports
OptionalDefault 2 RS485 ports can be customized asDefault 2 RS485 ports can be customized as 1 RS485, 1 RS232,
1 RS485, 1 RS232,CAN (2.0A/B) port is optional
or 1 RS485, 1 CAN (2.0A/B),
or 1 RS232, 1 CAN (2.0A/B)
CX3G-48M can add Ethernet port.
SoftwareCompatible with WORKS 2

Packing&Shipping

Packaging:The products will be under testing for 1-3 days and packed with carton box .

The package will include:
* 1 set of plc device+cables 
* Software and manuals are free of charge.They are available on our website or please contact our sales team for download links.
Note

 Shipping

By courier, door to door

For samples, the package will be delivered by DHL/UPS/FedEx/EMS express. Usually it will take 3-7 days to your location. 

 Post service

If you are not hurry but need economical delivery, we can go with packet channel. The delivery time depends on your location.

 Air shipping or by sea

If bulk order, the packages will be delivered by air shipping or by ship. 

 As some local customs require specific information for local import, please offer the information if you need the package to be sent to these countries.

India:  PAN or IEC or GST number

Peru: Tax number

Argentina: Tax number

Chile: Tax number

Brazil: CNPJ or CPF number

Bulgaria: Tax number for DHL shipping 


FAQ:

1.PLC can’t communication with PC (can’t monitor, can’t download)
There are several situations in which PLC and computer communication are not available. 
(1)PC serial port is broken, there is no way to use it.
(2)USB to 232 for laptop, the driver is not installed.
(3)PC serial port may leak, burn the PLC download protection resistor.
(4)Select wrong COM port on PC hardware.
(5)Can communicate, communication is unstable, check the line, try to replace the computer.
Summary: There are a variety of situations in which PLC can't download. It is recommended to use the replacement method to troubleshoot, such as replacing the computer, changing the download cable, replacing the PLC, etc.

2.PLC internal data (program) error 
Fault performance: data jumps, the program does not follow the normal execution. Possible causes:
(1)Use GX 8.52 or GX8.86 or Works 2 programming software not provided by our company, After replacing the software, turn off  
       


Company qualification:

Best relay in plc programming Suppliers for environmental protection engineering-1



The company attaches great importance to product quality and strives for excellence in all aspects of production. The produced are exquisite in workmanship, excellent in quality and strong in practicability.
Shenzhen Coolmay Technology Co., Ltd. has an experienced production team, which provides a strong guarantee for the high output of . Not only that, the company has also set up a QC team, which is responsible for testing the quality of to ensure its quality Superior, extraordinary quality.
The of Shenzhen Coolmay Technology Co., Ltd. is made of high-quality materials, durable, and has professional designers to carry out product concept design. The overall appearance and structure of the product are advanced, and then rely on advanced production equipment and technology for manufacturing. The finished product is of good quality and of good quality.
After years of industry exploration, Shenzhen Coolmay Technology Co., Ltd. has not only accumulated rich production experience, but also mastered advanced production technology, which can realize good and fast production, and all have undergone strict quality inspections and meet national standards Quality inspection standards, quality is trustworthy.
In the whole production process, there are personnel to inspect, not only that, Shenzhen Coolmay Technology Co., Ltd. also has a testing department, which conducts re-inspection of various performance indicators before leaves the factory to ensure that meets the needs and expectations of customers.
The product has the functionality that meets the application needs. It is less likely to occur the paper jamming problem
Chat Online
Chat Online
Chat Online inputting...
Sign in with: